BANKING35 Days Handover
Fully Commissioned
HDFC Bank — Rudrapur Branch
Turnkey branch interior execution, Class-A electrical panel layout, integrated CCTV & teller counter joinery.




Project Overview & Execution Scope
AMS Enterprises executed the complete turnkey interior fit-out and high-voltage electrical commissioning for HDFC Bank's flagship branch in Rudrapur, Uttarakhand. The scope encompassed full civil finishes, acoustic ceiling installations, custom teller counter joinery, high-security vault door setting, and Class-A electrical power distribution with dual-source LT panels and AMF synchronization.
Key Technical Deliverables
Completed full turnkey delivery within a strict 35-day timeline with zero operational delays.
Custom Class-A electrical distribution panel with 100% copper busbars and automatic mains failure (AMF) switchover.
RBI-compliant strongroom vault reinforcement and high-security biometric access integration.
Acoustic gypsum drywall partitions achieving NRC rating > 0.75 for private wealth cabins.
Technical Specifications Ledger
| Built-up Area | 4,200 Sq. Ft. |
| Electrical Load | 65 kVA Sanctioned |
| HVAC System | Daikin VRV IV Air Conditioning |
| Security Norms | RBI Grade-B Vault & Dual NVR Surveillance |
| Illumination Level | 350 Lux Uniform LED Grid |
| Fire Safety | Addressable Smoke Detectors & Sprinklers |