
HDFC Bank — Rudrapur Branch
Turnkey branch interior execution, Class-A electrical panel layout, integrated CCTV & teller counter joinery.
Over 250+ delivered sites for India's leading financial institutions and commercial enterprises. Delivering high-precision turnkey interiors and certified Class-A electrical engineering with zero operational downtime.

Turnkey branch interior execution, Class-A electrical panel layout, integrated CCTV & teller counter joinery.

Executive client lounge, hand-finished walnut wood wall paneling, perimeter coffered cove lighting & frameless glass.

Complete banking hall fitout, structural RCC strongroom vault installation, acoustic ceiling tiles & VRV HVAC.

Heavy three-phase power distribution, redundant UPS rooms, precision data networking, ATM kiosk & security vaults.

Structural interior overhaul, complex floor trunking rerouting, heavy power cabling, and branch modernization.

Modern branch fitout with VRV air-conditioning coordination, modular cash counters, fire safety & access control.

High-density acoustic wall paneling, modular teller counter fabrication, fire retardant doors, and earthing matrix.

Complete interior woodwork, electrical insulation testing, bank safe room reinforcement, and security cage.

Historic site high-precision modernization, seamless integration of high-grade copper wiring without altering facade.

High-bay warehouse luminaire grid, 1200A main LT distribution switchgear panel, lightning protection & chemical earthing.
Behind-the-scenes engineering: precision switchgear wiring, RBI-compliant steel reinforcement, and micro-tolerance acoustical joins.




Bank branches and commercial hubs have inflexible launch schedules. Our multi-trade coordination guarantees every audit parameter is certified before Day 1 operations.
Zero delayed handovers across 250+ scheduled institutional launches in North India.
Lost-time incidents or job-site fatalities achieved through strict safety compliance.
Full adherence to RBI vault specifications, CEA norms, and NBC fire clearances.
Punch-list items on Day 1 walkthrough, with mandatory 48-hour resolution signoff.
| SCOPE OF WORK | BANKING STANDARDS | COMMERCIAL FITOUT | TYPICAL CYCLE TIME | TESTING PROTOCOL |
|---|---|---|---|---|
Class-A Electrical & DB Layout | BIS 732, CEA Compliant | Dual-source with AMF & ATS | 15 – 20 Days | Megger, Earth Pit < 1Ω |
Strongroom & Safe Enclosure | Class-B / Class-C Vault Norms | Secure Server Cage & Firewalls | 12 – 18 Days | Core Structural & Tamper Tests |
Acoustic Ceilings & Wall Paneling | FR Grade Gypsum / Metal Tiles | Walnut Veneer & Poly Fabric | 10 – 14 Days | NRC Rating 0.70+ Verification |
Surveillance & Central Access | 30-Day Dual NVR Redundancy | Biometric Door Interlocks | 7 – 10 Days | Fail-Safe Override & Cloud Sync |
Connect with our senior engineering division for a site technical survey, Single Line Diagram (SLD) layout, BOQ estimation, and statutory compliance timeline.
Consult directly with our licensed electrical engineers and turnkey project leads. Complete tender documents, single-line diagrams, and BOQs delivered on schedule.