AMS ENTERPRISESINTERIOR & ELECTRICAL CONTRACTOR
TRACK RECORD OF TECHNICAL EXCELLENCE

Projects That Speak For Our Work

Over 250+ delivered sites for India's leading financial institutions and commercial enterprises. Delivering high-precision end-to-end interiors and certified electrical & power infrastructure with zero operational downtime.

250+COMPLETED SITES
100%TIMELY HANDOVER
Active Coverage: Delhi NCR, Dehradun, UP, Uttarakhand, Haryana & Punjab
0 OF 0 CASE STUDIES
FIELD EXECUTION REALITY

On-Site Technical Archives

Behind-the-scenes engineering: precision switchgear wiring, RBI-compliant steel reinforcement, and micro-tolerance acoustical joins.

Explore Complete Construction Gallery
LT Switchgear Integration
LT Switchgear Integration
Slatted Acoustic Millwork
Slatted Acoustic Millwork
Architectural Cove Lighting
Architectural Cove Lighting
Vault Security Interlocks
Vault Security Interlocks
ZERO-PENALTY SLA COMMITMENTS

Execution Reliability Standards

Bank branches and commercial hubs have inflexible launch schedules. Our multi-trade coordination guarantees every audit parameter is certified before Day 1 operations.

Certified Power Infrastructure
ISO 9001:2015
TIMELY HANDOVER
100%

Zero delayed handovers across 250+ scheduled institutional launches in North India.

HSE PROTOCOL
0

Lost-time incidents or job-site fatalities achieved through strict safety compliance.

BANKING NORMS
100%

Full adherence to RBI vault specifications, statutory electrical norms, and NBC fire clearances.

SNAG RESOLUTION
< 0.5%

Punch-list items on Day 1 walkthrough, with mandatory 48-hour resolution signoff.

Turnaround & Technical Milestone Ledger

Typical critical path schedule for standard 3,500 – 5,000 sq. ft. banking facilities
End-to-End Lifecycle: 30 – 35 Days
SCOPE OF WORKBANKING STANDARDSCOMMERCIAL FITOUTTYPICAL CYCLE TIMETESTING PROTOCOL
Heavy Electrical & DB Layout
BIS 732, Statutory CompliantDual-source with AMF & ATS15 – 20 DaysMegger, Earth Pit < 1Ω
Strongroom & Safe Enclosure
Class-B / Class-C Vault NormsSecure Server Cage & Firewalls12 – 18 DaysCore Structural & Tamper Tests
Acoustic Ceilings & Wall Paneling
FR Grade Gypsum / Metal TilesWalnut Veneer & Poly Fabric10 – 14 DaysNRC Rating 0.70+ Verification
Surveillance & Central Access
30-Day Dual NVR RedundancyBiometric Door Interlocks7 – 10 DaysFail-Safe Override & Cloud Sync
TENDERING & PROJECT COMMISSIONING DESK

Planning a new banking branch or enterprise facility?

Connect with our senior engineering division for a site technical survey, Single Line Diagram (SLD) layout, BOQ estimation, and statutory compliance timeline.

BOQ Formulation
Electrical Load Sanctioning
Statutory & Fire Clearances